07.04.2014

Boiler Cavity

 F10 Transfer Tower

 East Side FD/PA fan

 Pipe-rack 6

  Pipe-rack 5

 Steel structure from Boiler to Fabric Filter

 Steel structure from Fabric Filter to FGD

 MCWPH

 MCWPH

 MCWPH

 Electrcholrination BLD

 PIperack 11

Coal yard Control Building

 Coal yard Control Building

 Coal yard Conveyor

 Fuel Oil transfer Station

 Fuel Oil transfer Station

 Fuel Oil transfer Station

 Fuel Oil Piping

 Fuel Oil Piping 

  Fuel Oil Piping

 Coal Conveyor

 Coal Conveyor

 Coal Crusher

 Coal Crusher

 Coal Conveyor

 Piperack 16

 Coal & BOP Electrical Building

 Water & BOP Electrical Building

 Aeration Basin

 Aeration Basin

 Aeration Basin Fan station

 Aeration Basin Elec BLD

  Aeration Basin Elec BLD

 Auxilary Steam

 Stacker reclaimer SRA

 I/O station south

 H2 slab

 Ash Pond

 Ash Pond


No comments: