STH 16m lvl
STH 16m lvl
STH 16m lvl
STH 16m lvl
STH 16m lvl
STH 16m lvl
STH 16m lvl
STH 16m lvl
STH 16m lvl
STH 8m lvl
STH 8m lvl
STH 8m lvl
STH 8m lvl
STH 0m lvl
STH 0m lvl
STH 0m lvl
STH -5.2m lvl
STH -5.2m lvl
STH -5.2m lvl
STH -5.2m lvl
STH -5.2m lvl
STH Roof lvl
STH south facade
Main Transformer compound
CEB - control rm
N2 stprage
Boiler Cavity
Boiler SCC
Boiler south
Boiler 69m lvl
Boiler 69m lvl
Boiler 69m lvl
Boiler Feeder floor
Boiler Tripper floor
Boiler Tripper floor
Boiler on lvl
Boiler east side
Boiler east side
FGD Absorber east side
FGD Absorber south
Fabric Filter east side
ID fan east side
Absorber north
Absorber pump and Aeration fan station
Absorber pump pump station
Aeration basin
Aeration basin
Aeration basin
SW Discharge channel
Lnadscaping north of Aeration basin
Fabric Filter
Bottom ash transfer and Silo
Bottom ash transfer and Silo
MCWPH
MCWPH south side
MCWPH east side
MCWPH north side
MCWPH
MCWPH
Electrochlrorination Plant
Electrochlrorination Plant
Electrochlrorination Plant
Electrochlrorination Plant
Industrial waste water plant
Industrial waste water plant
Industrial waste water plant
Sanitary waste water plant
Flay ash transfer
Flay ash transfer
Flay ash transfer
Fly ash pond west side
Fly ash pond east side
Compressor plant east side
GRP phase 5 protection slab
Oil waste separator pit
Roadway 10east (to MCWPH)
Store Building
Store Building
Stacker reclaimer B
Stacker reclaimer A
Coal yard run off basin south
No comments:
Post a Comment