STH Level 16.0m |
STH Level 16.0m |
STH Level 16.0m |
STH Level 16.0m |
STH Level 16.0m - turbine |
STH Level 16.0m - generator |
STH Level 16.0m |
STH Level 16.0m - baby turbine |
STH Level 16.0m |
STH Level 16.0m |
STH |
STH Level 0.0m |
STH Level 0.0m |
STH south view |
Access to STH and transformers |
CEB control room |
CEB control room |
CEB control room |
Fabric filters |
Boiler |
N2/CO2 gas bottles shed |
Boiler |
Boiler |
Boiler |
Boiler elevator installation is in progress |
Boiler |
Boiler |
Boiler |
Boiler |
Boiler tripper floor |
Boiler tripper floor |
Boiler north view |
FD fans east side |
Duct between Fabric Filters and Boiler east side |
FGD east side |
Air compressor building roof top |
Aeration basin |
Aeration basin |
Client HV switchyard |
Piperack 15.2 |
Piperack 6 |
Coal yards |
Coal transfer towers |
Stacker reclaimer A |
Stacker reclaimer B |
Stacker reclaimer A and coal yard north view |
GRP Phase 5 |
GRP Phase 5 |
Fly ash silo |
Fly ash silo |
Fly ash silo |
Fly ash silo |
Fly ash silo |
Fly ash conveyor |
Bottom ash silo |
Piperack 5 and Bottom ash conveyor |
Bottom ash conveyor |
Bottom ash transfer tower and conveyor |
Air compressor building |
Demin plant |
Water treatment plant |
Water treatment plant |
Water treatment building - sampling room |
Fire fighting piping for air compressor building |
Fire fighting pump house |
Sanitary waste water treatment building |
Treated wastewater reclaimed plant |
Treated wastewater reclaimed plant |
Industrial water control room |
Piping in water treatment plant |
Industrial waste water control room |
Treated wastewater reclaimed plant |
Demin plant |
Warehouse building north side |
Warehouse building internal view |
Industrial waste water treatment plant |
Industrial waste water treatment plant |
Coal run-off basin |
Fuel oil forwarding station |
Demin plant |
Service and fire water tank |
MCWPH and Electrochlorination plant |