| FGD north view |
| FGD south view |
| Duct between FF and Boiler west view |
| ID fan duct west view |
| Fabric Filter roof top view |
| Fabric Filter south view |
| Ducts between Boiler and Fabric Filter top view |
| CEB west view |
| Boiler Control Building |
| Boiler Level 0.0m |
| Boiler piping insulation in progress |
| Boiler |
| Boiler piping insulation in progress |
| Boiler |
| Boiler tripper floor |
| Boiler tripper floor |
| Boiler coal conveyor at tripper floor |
| Boiler coal conveyor at tripper floor |
| Boiler coal conveyor at tripper floor |
| Boiler elevator under installation |
| Boiler |
| Boiler |
| FD and PA fan top view |
| FD and PA fan west view |
| Coal transfer towers |
| Transfer tower 13 |
| Bottom ash silo |
| Stacker reclaimer A |
| Stacker reclaimer B |
| Coal handling control building |
| Warehouse building |
| Warehouse building inside view |
| Air compressor building |
| Aeration basin |
| Industrial waste water treatment |
| Industrial waste water treatment |
| Coal run-off basin |
| Service and Fire water tanks |
| Demin plant |
| MCWPH and Electrochlorination Plant |
No comments:
Post a Comment