FGD north view |
FGD south view |
Fabric Filter roof top view |
Fabric Filter/FGD Electrical building |
STH Level 16.0m |
STH Level 16.0m |
STH Level 16.0m |
N2-CO2 Gas Bottles shed |
Boiler hoppers |
Boiler 19.0m level |
Boiler tripper floor |
Boiler tripper floor |
Boiler tripper floor |
Boiler tripper floor |
Boiler tripper floor |
Boiler tripper floor |
CO2 tank shed |
FD & PA fan west side |
ID fan west side |
Store building |
Fly ash silo |
Bottom ash silo and conveyor |
Bottom ash silo and conveyor |
Coal crusher house |
Coal conveyor BC-06 |
Coal transfer tower 13 |
Stacker reclaimer A |
Stacker reclaimer B |
Service and fire water tanks |
Industrial waste water treatment plant |
Demin plant |
Coal yard run-off basin |
FGD Aeration basin |
FGD Aeration basin electrical building |
FGD Aeration basin electrical building |
FGD Aeration basin electrical building |
FGD aeration basin |
Electrochlorination building |
Electrochlorination building top level |
MCWPH |
MCWPH drum screens |
MCWPH flooding |
MCWPH intake flooding |
MCWPH intake flooding |
MCWPH |
CW discharge channel |
No comments:
Post a Comment