STH Level 16.0m |
STH Level 16.0m |
STH Level 16.0m |
STH Level 19.0m |
STH south view |
STH Steam blowing piping |
CEB Control room |
CEB Lvl 16.0m Relay room |
Boiler cavity |
Boiler cavity |
Boiler cavity
|
Boiler Tripper Floor |
Coal conveyor BC06 |
Coal conveyor BC06 |
Coal conveyor BC06 |
CO2 tank |
Fabric filters rooftop |
FGD |
FGD duct B side |
FGD duct B side |
FGD duct A side |
Coal handling and BOP electrical building |
Coal conveyor BC-01 TO BC-06 |
Transfer tower 13 |
Transfer tower 13 south view |
Transfer tower 13 west view |
Coal crusher house |
Coal conveyor BC-06 |
Bottom ash TT and conveyor |
Piperack 14 |
Piperack 7 |
Piperack 9 |
Piperack 8 & Aux Steam Line |
Piperack 6 |
MNG4 south east view |
MCW pipe north of STH |
Service water plant |
Air compressor plant |
HP Fire fighting pump house |
LP Fire fighting pump house |
Coal yard run-off basin |
Industrial waste water treatment |
Demin plant |
FGD Aeration basin |
FGD Electrical building |
FGD Aeration basin |
Ash pond |
MCWPH steel structure |
MCWPH |
MCWPH |
MCWPH |
MCW pipe to MCWPH |
MCW Intake |
Electrochlorination building ground floor |
Electrochlorination building first floor |
Electrochlorination building first floor |
Client new HV line |