| Boiler - Ljungstrom Air Heater |
| Boiler - Pressure Parts |
| STH - 4.5m level LBC piping |
| STH - 0m level CCW piping |
| STH - -5.2m level Cable Tray Works |
| STH - Condenser components @ 0M lvl |
| STH - SteamTurbine Bearings |
| STH - LP Casing and Generator |
| FW Tank - 1st section |
| Feed-water tank 2nd section onsite |
| Feed-water tank lifting of 2nd section |
![]() |
| Feed-water tank lifting of 2nd section |
![]() |
| Feed-water tank lifting of 2nd section |
![]() |
| Feed-water tank lifting of 2nd section |
![]() |
| Feed-water tank lifting of 2nd section |
| STH - Lube Oil Room |
| Bottom Ash Silo |
| Fly Ash Silo |
| Fabric Filter |
| Condensate Make Up Tank - Looking North |
| Land Reclaimation Works |




No comments:
Post a Comment