10.04.2013

Power Block Northwest Side

Boiler Backpass Hanger Rods Support Structure and Boiler Walls

Boiler - LBC Piping and Support Works @ 45m Level

STH - Lube Oil Room Rebar work

STH - Roofing Looking West

STH - ST / Gen Table

Central Electrical Building

 Central Electrical Building @ 0m level

  Central Electrical Building @ 4m level

Central Electrical Building @ 4m level

  Main Transformer Area- Looking East

Fabric Filter - Looking North

FGD_RGP and MCW Pipes - Looking Southeast

Aeration Basin and CW Discharge Trench - Looking Southeast

Service/Fire/Potable tank foundation - looking east

Demin Water Plant and Tanks Foundations

Bottom Ash Silo

Condensate Make up Tank - Looking North

Fly-ash Silo Foundation

FGD Area Slab - Northside

Booster Fan - Looking Southwest

FGD Area Slab - Southside
Dinner Function with Mr. Joseph Chriqui

Dinner Function with Mr. Joseph Chriqui