Power Block Northwest Side |
Boiler Backpass Hanger Rods Support Structure and Boiler Walls |
Boiler - LBC Piping and Support Works @ 45m Level |
STH - Lube Oil Room Rebar work |
STH - Roofing Looking West |
STH - ST / Gen Table |
Central Electrical Building |
Central Electrical Building @ 0m level |
Central Electrical Building @ 4m level |
Central Electrical Building @ 4m level |
Main Transformer Area- Looking East |
Fabric Filter - Looking North |
FGD_RGP and MCW Pipes - Looking Southeast |
Aeration Basin and CW Discharge Trench - Looking Southeast |
Service/Fire/Potable tank foundation - looking east |
Demin Water Plant and Tanks Foundations |
Bottom Ash Silo |
Condensate Make up Tank - Looking North |
Fly-ash Silo Foundation |
FGD Area Slab - Northside |
Booster Fan - Looking Southwest |
FGD Area Slab - Southside |
Dinner Function with Mr. Joseph Chriqui |
Dinner Function with Mr. Joseph Chriqui |