28.05.2013

  Boiler - Pressure Parts
 Boiler - Ljung Air Heater
 Boiler - Ducting
 Boiler - Coal Piping
  Boiler - Cable Tray @ 63M lvl
Boiler - Main Steam Piping
Mill E - Bearing Pedestal
 STH - LP1 Upper Casing Installation
  STH - LP1 Upper Casing Installation
  STH - Condenser Area
 STH - Condenser Neck on Sliding Beam @ 0M lvl
  STH - CCW Piping @ 0M lvl
  STH - CCW Piping @ 8M lvl
Cable Tray Bridge
 Condensate Make Up Tank - Looking North
 CEB @ 0M lvl
  CEB - Fire Fighting Piping  @ 0M lvl
 CEB - Junction Box @ 10M lvl
 CEB -LV Panel Cable Termination @ 10M lvl
CEB - Battery Room
CEB - Emergency Shower / Handwash Inside Battery Room 
 CEB - AHU @ 10M lvl
 CEB - Marshalling Panel
 CEB @ 20M lvl
 Main Transformer Area 
  Unit Transformer 
 FF and FGD - Looking North
   FGD - Looking East
 Demin Water Treatment Plant & Tanks - Looking Southeast
  Service/Fire Water Pumphouse & Tanks - Looking East
 Coal Yard Transfer Tower #10 - Looking West
 Aeration Basin - Looking South
GRP Piping @  Aeration Basin