16.04.2013

Power Block West Side

Boiler Backpass Hanger Rods Support Structure and Boiler Walls

STH - Looking East

STH - ST / Gen Table

Central Electrical Building @ 0m level

Central Electrical Building @ 4m level

Cable Rack between CEB and STH

Main Transformer Area- Looking East

FGD_GRP and MCW Pipes - Looking Southwest

MCW Piping at Aeration Basin

Aeration Basin

Aeration Basin

CW Discharge Trench

Booster Fan - Looking Southwest

Screening Plant

Condensate Make up Tank - Looking North

Fly Ash Silo

Cooling Water Pumphouse

Main Site Access Road - Surface and Finishing Works

Manjung 4 Project