| Power Block West Side |
| Boiler Backpass Hanger Rods Support Structure and Boiler Walls |
| STH - Looking East |
| STH - ST / Gen Table |
| Central Electrical Building @ 0m level |
| Central Electrical Building @ 4m level |
| Cable Rack between CEB and STH |
| Main Transformer Area- Looking East |
| FGD_GRP and MCW Pipes - Looking Southwest |
| MCW Piping at Aeration Basin |
| Aeration Basin |
| Aeration Basin |
| CW Discharge Trench |
| Booster Fan - Looking Southwest |
| Screening Plant |
| Condensate Make up Tank - Looking North |
| Fly Ash Silo |
| Cooling Water Pumphouse |
| Main Site Access Road - Surface and Finishing Works |
| Manjung 4 Project |