| Power Block Northeast Side |
| Boiler - North Side |
| Boiler Backpass Hanger Rods Support Structure |
| STH - Roofing West Side |
| Central Electrical Building @ 0M lvl |
| Central Electrical Building @ 4M lvl |
| Fabric Filter Plant |
| MCW Pipe saddles - between Boiler and STH |
| MCW and MCW Saddle south of HV Line (North End) |
| MCW Saddle at Aeration Basin |
| Aeration basin |
| Aeration basin |
| CW Discharge Trench |
| Condensate Make up Tank - Looking North |
| Cooling Water Pumphouse |
| Manjung 4 Project |
No comments:
Post a Comment