| Power Block - Looking Northweast |
| Power Block - Looking Southwest |
| Boiler East Side -Ducting Installation |
| Boiler-Pressure Parts Walls |
| Boiler-Area 2 |
| Power Block - Looking Southeast |
| Steam Turbine Hall - Looking Northwest |
| Steam Turbine Hall - Looking East |
| Steam Turbine Hall - Annex |
| Central Electrical Building - Looking East |
| Central Electrical Building - Gnd Flr |
| Central Electrical Building - 1st Flr |
| Central Electrical Building - 1st Flr cable tray works |
| Central Electrical Building - 2nd Flr |
| GSU Trafo Foundation |
| Boiler Electrical Building |
| Fabric Filter Plant |
| Cooling Water Pipe Saddle East Side of STH |
| MCW & GRP Pipes South of New HV Line (North end) |
| MCW & GRP Pipes South of New HV Line (South end) |
| MCW Pipe Trench at Reclaimed Existing 5 yr Ash pond |
| MCW Pipe Trench at Reclaimed Existing 5 yr Ash pond |
| Reclaimed Existing 5 yr Ash pond |
| Demin Water Tank Fdn Works |
| FGD Area - Looking South |
| Electrical Pit #002 and #003, Condensate Make Tank |
| Fly Ash Silo Fdn |
| Screening House - Looking Southwest |