| Boiler and Steam Turbine Hall - Looking North |
| Boiler Area 6 |
| Boiler - Installation of Header |
| Boiler - Preparation for Installation of Headers |
| Boiler Area 1 |
| Steam Turbine Hall - Looking West |
| Steam Turbine Hall - Looking East |
| Steam Turbine Hall - Annex |
| Steam Turbine Hall - Installation of Grating |
| Central Electrical Building and Aux. Trafo - Looking West |
| Central Electrical Building and Aux. Trafo - Looking Northeast |
| Central Electrical Building - Gnd Flr |
| Central Electrical Building - 1st Flr |
| Central Electrical Building - 2nd Flr |
| GSU Trafo Foundation - Looking East |
| Boiler Electrical Building |
| Fabric Filter Plant - South Side |
| MCW Pipe Trench North of New HV Line |
| MCW & GRP Pipes South of New HV
Line
|
| MCW Pipe Trench at Reclaimed Existing 5 yr Ash pond |
| Industrial Waste Water |
| Bottom Ash Silo Piling |
| Aeration Basin |
| FGD Duct Foundation and ID Fans - Looking West |
| FGD Duct 1 |
| Demin Plant & Tanks |
| U/G Electrical Ducting - West of STG |