HEAVY LIFT OFFSHORE BARGE CRANE ARRIVES ON SITE
CRANE BERTHS IN TEMPORARY JETTY DESIGNED AND BUILT BY M&R FOR CULVERT SECTION LOADING.
LOW LEVEL SITE TESTING OF LIFTING RIG, - NOTE HYDRAULIC SYSTEM TO CONNECT AND DISCONNECT FROM THE CULVERT UNDERWATER.
TEST FIT & PMA TESTING OF LIFTING ACCESSORIES
BARGE CRANE IN POSITION - NOTE HOOK BLOCK & 35TON EXCAVATOR FOR SCALE
FINAL PREPARATION & PAINTING WITH MARINE ANTI-FOULING PAINT
FULL LIFT AND TRANSFER FROM SHORE TO INSTALLATION BARGE. (6 MAX. PER TRIP)
FINAL PRE-CASTING CONSTRUCTION OF MAKE UP & INTAKE HEAD, CULVERT PIECES