12.06.2012

 Phase2_SWFGD_GRP-West of Chimney - Looking East
 Phase2_SWFGD_GRP-North of Chimney - Looking West
  Boiler Electrical Building - Looking Southwest
 Fabric Filter-East Side - Looking North
  Boiler Area - Looking Southeast
  Boiler-Structural Steel-East Side - Looking Southwest
  Boiler-Structural Steel-West Side - Looking Southwest
  Boiler-Structural Steel - Looking Northeast
  Boiler-Structural Steel - Looking Northeast
  Mill A & B - Looking Southwest
Mill C Foundation - Looking Southwest
  Eversendai_Pre-Fabrication Area - Looking North west
 Eversendai_Assembly of 600T Crane - Looking Northwest

  Boiler-North Side-Access for 600T Crane - Looking East
   Boiler-East Side - Looking South
  Boiler Cavity Area - Looking North
 Ash Hopper - Looking Southeast
 Boiler-Electrical Pit # 4 - Looking West
  Boiler-Concrete Gully Across Cavity Area and East Side- Looking East
   Steam Turbine Hall-East Side - Looking Southwest
  Steam Turbine Hall-South Side - Looking Northwest
  Steam Turbine Hall-South Side - Looking Northeast
  Steam Turbine Hall-North Side - Looking East
  Central Electrical Building - Looking North
 MCW-Beneath New HV Line - Looking Southeast
 Reclamation by Aeration Basin - Looking Southeast
Client Tower New HV Line-North Line Connecting to Existing Switchyard