29.05.2012

 Phase2_SWFGD_GRP-North Side of Chimney - Looking West
  Phase2_SWFGD_GRP-West Side of Chimney - Looking Southeast
 Boiler-Structural Steel-East Side - Looking Southwest
  Boiler-Structural Steel-East Side - Looking East
  Boiler-Structural Steel-East Side - Looking Northwest
Mill H & G - Looking Southeast
Eversendai-Pre-Fabrication Area - Looking Southwest

 Boiler-West Side-Structural Steel Staging Area - Looking North
 Boiler-U/G Electrical Conduit Pit #1 to Mill Side - Looking East
  Boiler-U/G Electrical Conduit from Elect'l. Pit #2 to Elect'l.  Pit #3 - Looking West
 Boiler-West Side- Concrete Gully - Looking North 
 Steam Turbine Hall - Looking West
  Steam Turbine Hall - Looking Northwest
  Steam Turbine Hall - Looking Northeast
  Steam Turbine Hall - Looking Southeast
  Steam Turbine Hall-North Side Wall - Looking Southeast
  Steam Turbine Hall-North Side- Looking East
 Central Electrical Building - Looking Northeast
 Phase1_SWFGD_GRP-Beneath New HV Line - Looking North
MCW-Beneath New HV Line - Looking North
MCW Bet. New HV Line and Aeration Basin-Sheet Piling - Looking South
Delivery - MCW Pipes 
 2/5 of Client Tower for New HV Line - Looking Southeast
 Offshore-Dredging Works - Looking Southeast
 Offshore-Dredging Works - Looking Southeast
 Cooling Water Intake Area - Looking West 
 Aerial View-Cooling Water Intake Area -First Installed Precast Box Culvert - Looking South 
 Cooling Water Pumphouse-Sheet Piling Started - Looking Southwest 
  Cooling Water Pumphouse-Preparation for Load Test Pile - Looking Northwest