08.05.2012

 Panoramic View-Boiler Area - Looking South
 Panoramic View-Main Cooling Water and Seawater Flue Gas Desulphurisation-Glass Reinforced Pipes Beneath New HV Line - Looking South

 Chimney and Phase 2 Seawater Flue Gas Desulphurisation-Glass Reinforced Pipes - Looking Southwest 
 Phase 2 Seawater Flue Gas Desulphurisation-Glass Reinforced Pipes - West Side of Chimney - Looking East 
 Boiler Electrical Building - Looking Southwest


 Boiler-West Side - Looking South - Start of the Installation of the Geotextile Membrane 
Electrical Pit #8 -  Looking South
Electrical Pit #7 -  Looking South 
 Electrical Pit #6 -  Looking South
 Boiler-West Side - Looking South  
 Ash System Pit - Looking Southwest
 Boiler F8 - Looking South
Ash Hopper - Looking Southwest
 Boiler-Mechanical-East Side - Looking East
  Boiler-Mechanical-East Side - Looking North
  Boiler-Mechanical-East Side - Looking Southwest
  Steam Turbine Hall-South Side - Looking East
   Steam Turbine Hall-South Side - Looking West
 Steam Turbine Hall-East Side - Looking West
  Steam Turbine Hall-South Side - Looking North


 Main Cooling Water Beneath New HV Line - Looking North
 Phase 1 Seawater Flue Gas Desulphurisation-Glass Reinforced Pipes - Looking North
 Client Tower for New HV Line @ the 25 year Ash Pond 
Reclaimation by Aeration Basin - Looking South