08.10.2011

Installation Of P.C Slab -Consortium Office -1st Floor.

Concreting To Pile #C34-1000mm dia. -Boiler.


Concreting To Pile #T204-1000mm dia. -Turbine Hall.

P.C Slabs -1st Floor -Consortium Office.