17.10.2011

Lean Concrete -Pile Cap -Bunker/Mill.

Installation Of Steel Cages -Pile #T081-Turbine Hall.

Preparation For MLT -Pile #B82-1000mm dia. -Boiler.

Installation Of Side Formwork -1st Floor Slab -Consortium Office.

Laying Of BRC -1st Floor Slab -Consortium Office.