Preparation For Load Test (MLT) -Pile Point # B93-800mm dia. -Boiler.
Finishing Works To Base Slab-Consortium Office -CMC.
Final Preparation Prior Concreting To Base Slab -Consortium Office -Alstom.
Concreting To Ground Beam -Consortium Office.
Concreting (Build-Up) To MLT Pile Point # B82-1000mm dia. -Boiler.
Concreting To 1st Pile For Synohydro @ Turbine Hall -Pile # T241 -1000mm dia.
Turbine Hall -Bore Pile Working Area -Synohydro.