28.10.2014

FGD south east view
ID fans
Ducts between FF and Boiler east view
Boiler north view
PA fans east view
N2/CO2 gas bottles
Power block south east view
Fly ash silo
Fly ash conveyor
Plant road and drainage preparation
Industrial Waste Water Treatment
Industrial Waste Water Treatment
Industrial Waste Water Treatment
Industrial Waste Water Treatment
Industrial Waste Water Treatment
Industrial Waste Water Treatment
Service water and demin tanks
Plant road and drainage preparation
Plant road and drainage preparation
Industrial Waste Water Treatment
Industrial Waste Water Treatment
Industrial Waste Water Treatment
Air compressor station
Air compressor station
Sanitary waste water treatment plant
Sanitary waste water treatment plant
Electrochlorination building
Electrochlorination building
Electrochlorination building
Electrochlorination building
MCWPH
MCWPH
MCWPH
MCWPH intake

27.10.2014

STH Level 16.0m overall view
STH Level 16.0m
STH Level 16.0m - replacement of bolts/threads for IP Actuator
STH Level 16.0m - replacement of bolts/threads for IP Actuator
STH Level 16.0m
STH Level 16.0m - removal of bearing casings
STH Level 16.0m - removal of bearing casings
STH Level 16.0m - removal of bearing casings
STH Level 16.0m - removal of bearing casings
STH Level 16.0m - removal of bearing casings
STH Level 16.0m - removal of bearing casings
STH Level 16.0m - slab rebar for finishing work
STH Level 16.0m - slab finishing work
STH Level 16.0m - cabling
STH Level 8.0m
Boiler Level 60.0m opening to spacer tubes
Boiler Level 60.0m old spacer tubes cut-out
Boiler Level 60.0m old spacer tubes cut-out
Boiler Level 60.0m old spacer tube being removed
Boiler Level 60.0m new spacer tubes to be installed
Aeration basin
Earth leveling at Aeration basin
MCWPH intake - water being pumped out
MCWPH intake - water being pumped out
MCWPH interconnecting pipe
Internal view of MCWPH
MCWPH