25.09.13

 Piperack 1
 Fabric Filetr
 Boiler tripper floor
 Boiler Air preheater
 Boiler feeder floor
 Lowe furnace
 Boiler roof
 Boiler 0m lvl
 VO 11
 Raw water & Fire fighting 
 Demin Plant
 FGD ducting 
 Industrial waste basin
 Piperack 2
MCW & GRP U/G pipe
 MCW & GRP U/G pipe
 Coal handling & Bop Elec building
 Laydown area
 TTS 12 
TTS 10 

24.09.13

 STH - 16m table top
 STH - Generator 
  STH - PLC Rm
CEB 
 CEB
 Boiler Cavity
 Boiler Cavity
 Boiler FD fan east side
Boiler FD fan west side 
 Piperack 2
 FF/FGD Electrical Building
 FGD Ducting 
 BOP Compressor Building
 BOP Compressor Building
 Bottom Ash Silo
 BOP & Coal yard elec Building
MCW pipe

23.09.2013

 MNG 4 looking southwest
 Lub oil Equipment
 Generator
 STH 0m lvl Polishing plant
 IPB below Generator
IPB from GCB to Generator 
 STH south stairwell
 STH PLC Rm
 STH west facade
 CEB & piperack 7
 Piperack 15.1
 Piperack 3 & BEB
Main Transformer Compound west wall
 Unit Trafo BBT10
 Unit Trafo BBT20
 HV tower
 Cables Pit 8 (north of Boiler)
 Boiler Bunker bay
 Boiler Flash Tank
 Boiler Lower Furnace
 Boiler west side FD/PA fans
 FF/FGD Elec BLDG
 Absorber/Reactor
 FGD Ducts
 Aeration basin
 GRP phase 1 & 4
 Bottom Ash Silo
 MCWPH north end
 MCWPH center
 MCWPH center
 MCWPH south end
 Electrochlorination
 Demin plant
 Raw water pump house

 Coal Yard & BOP Elec BLDG
 Oil waste separator
 Stacker Re-claimer
 Screening house steel work
 Transfer Tower 10
Cola yard Control BLDG