27.08.2013

 Generator HV test in proccess
 Duplex heater east side
Duplex heater west side
Duplex Heaters  
STH 16m lvl
 Generator
 IPB
 STH 8m lvl
 STH grd lvl east of condenser
 Excitation Rm
 Lub oil Rm
 STH Cladding
 STH south-side stairwell
 Pipe-rack 1
 FGD duct-work
 Fabric Filter
 Boiler northend
 Boiler Lower Furnance assembly
Compressor Bldg
 Electrical Ducts between Pit 7 & 8
 MCW north of STH
Fire Fighting U/G pipe south of CEB
 Fire-Fighting Bldg Steel Erection
 Demin. Plant
 Coal Yard and BOP Electrical Building
 Oily Waste Emg. Drain pit
 MCW pipe
Client HV yard and New HV tower

26.08.2013


STH west wall 
 CEB south wall
 FD and PA fan foundations
 Cable duct between pit 7 & 8
 Fabric filter
 IPB
 Fire Alarm panel in CEB
 Temp LV supply for CEB
 MCWPH north end
 MCWPH center
 MCWPH south end
Fuel Oil Forwarding station 
 Coal Yard Control Rm

 Compressor Equipment foundation
 Industrial waste pit
 Coal Yard & BOP Elec Building
 Fire-fighting pumphouse
 Piperack 1
 Piperack 2
Raw water supply to Fire fighting PH

24.08.2013


 MCWPH
 Aeration Basin
 Aeration Basin
 Client HV switch yard
 CEB
Stacker reclaimer 2