25.06.2013

 MNG-4 Site AM
Power Block looking east 
Power Block looking north-east  
Power Block looking south-east  
 Power Block & BOP looking south-wast
 Power Block looking west
Power Block l& BOP looking north-wast 
 BOP looking south 
BOP looking south  
Laydown area looking south
Boiler North End

Boiler Cavity

STH - Lifting of HP Turbine

STH - CCW pipe

Boiler Electrical Building

Boiler Electrical Building

 Transformer Compound

Fabric Filter

FGD Duct Bypass

FGD Northwest End

ID Fan

 K11 Tank

MCW east of Turbine hall

24.06.2013

 MNG-4 Site PM
11kV back-feed supply 
 STH-Condenser
 STH-Condenser
STH-0m lvl ACW pipe
 MCWPH
 MCWPH
GRP Phase 4 
 GRP Phase 6
 GRP phase 3
 GRP phase 3
GRP Phase 3 
MCW east of Turbine hall
MCW & GRP bund crossing before aeration basin 
 MCW supply from  MCWPH
 MCW discharge drainage looking north
MCW discharge drainage looking south 
Piprack 10 
 Aeration basin north end
Aeration basin south end

22.06.2013

 Site view - North east end
STH - Condenser Neck 
STH - 8m lvl
STH - 8m lvl 
Boiler Electrical Building 
 Fabric Filter
 Boiler
 Transformer Compound
 K11 Tank
 FGD Duct Bypass
 Fabric Filter east side
 STH - Lub oil room
STH - Excitation Room 
 MCWPH
MCW - Discharge Channel