18.06.2013

Boiler cavity

STH-Condenser

STH - Piping Erection @ 0m level

STH - Polishing Plant @ -5.2m level

STH - MCW @ -5.2m level

STH - Lube Oil Room

STH - ST Generator

STH - CCW Tank

CEB - Cable Installation @ 0m level

CEB - Control Room

Transformer Compound

Waste Water Treatment

Bottom-ash Silo Foundation

FGD Duct & Absorber / Reactor tower North end

Fly Ash Silo

17.06.2013

 STH-Condenser neck
 STH-LP Heater 
STH - Polisihing plant 
STH - FWT 
K11 - Condensate return tank 
 Condenser modules
 CEB Aux Transformers
 Boiler cavity
 Boiler North end
 FGD Duct & Booster fans South end
Fabric Filter 
 FGD Duct & Absorber/Reactor tower North end
 SWFGD - Aertion basin
SWFGD - Aertion basin 
CEB - south end 
MCWPH - north end 
Fire-fighting pumphouse 
Compressor Building 
Coal Yard & BOP Electrical Building

15.06.2013

Boiler North side Rear end

Boiler Cavity

Boiler LBC piping

Boiler piping

 BEB - 4m lvl

 BEB - 4m lvl


 Transformer Compound

Fabric Filter

Bottom-ash Silo Foundation

Demin Plant and Tanks

Aeration Basin

Cooling Water Pumphouse

FGD Northwest End

Land Reclaimation East Side

14.06.2013

 Boiler LBC piping
Boiler LBC piping 
 Boiler LBC piping
 Boiler LBA piping
 Boiler LBA/LBB piping
 BEB - 4m lvl
CEB - Control room 
 STH - BTFWP 1 foundation
 STH - BTFWP 2 foundation
STH - STG table
 STH - Lube Oil Room
 STH 
STH - Roof 
 BEB - Roof
CEB - Roof 
CEB - Archetecural finishes