13.03.2013

Boiler - North side

 Boiler - Pressure Parts and Walls

 Boiler - Installation of Coal Piping

Steam Turbine Hall - GT / ST Table

CEB - 4m level

CEB - 10m level

 Main Transformer Area - Looking east

 BEB - Looking Northeast

Fabric Filter Plant

Demin Water Plant Foundation

 Service/Fire/Potable tank foundation - looking east


 FGD_GRP and MCW pipe looking southeast

 Aeration basin and Coooling water discharge trench

Cooling Water Pumphouse

Panoramic view of BOP Area

FGD Area North side

FGD Area South side

12.03.2013

FGD, Fabric Filter and Power Block

Boiler - Northeast side

 Boiler - Pressure Parts and Walls

 Boiler - Area 2

 Boiler - Cable Tray works at Area 2

CEB - Northwest side

CEB - Cable Pulling Works in progress - 0m level

CEB - Cable Pulling Works - 0m level

CEB - Cable Trays 4m level

MV Switchgear CEB - 4m level

CEB - Blockwork at 16m level

 Main Transformer Area - Looking east

CEB - GSUT and Unit Transformers

CW Discharge Trench

FGD Area - Ground beams


FGD Duct works

Fabric Filter Plant


Screening Plant Foundation

11.03.2013

FGD, Fabric Filter and Power Block

Boiler - Northeast side

Boiler - East side

 Boiler - Pressure Parts and Walls

Steam Turbine Hall (East Side)

Steam Turbine Hall Table - Curing of Concrete

Steam Turbine Hall (West Side)

CEB - Northwest side

CEB - Cable Pulling Started - 0m level

MV Switchgear CEB - 4m level

CEB - Blockwork at 16m level
 
CEB - GSUT and Unit Transformers on site

 Main Transformer Area - Looking east

 BEB - Looking north

Fabric Filter Plant south side

MCW and MCW Saddle at SWFGD GRP Phase 3

MCW and MCW Saddle south of HV Line

Aeration basin

FGD Duct Erection