28.11.2012


  Boiler - 3 of 5 Roof Girder Lifting/Installation on going - Looking South
 Boiler - 3 of 5 Roof Girder Lifting/Installation on going - Looking South
 Boiler and Fabric Filter - Looking Southeast
 Boiler and Steam Turbine Hall - Looking Northwest
  Boiler and Fabric Filter - Looking Southeast
Boiler- Feeder Floor Area - Looking East
 Boiler-Pressure Parts Hanger
  Boiler - 3 of 5 Roof Girder at Cavity Area
  Booster Fans - Looking Northwest
  Absorber Area - Looking North
  ID Fans - Looking Northeast
  Boiler Electrical Building - Looking North
 Fabric Filter -West Side- Looking Northwest
  Screening House - Looking North
Fly Ash Silo-Spun Piling Works - Looking North
 Industrial Waste Water Treatment Plant-Spun Piling - Looking South
 Demin Water Treatement Plant -Spun Piling - Looking Southeast
  Main Transformer Area - Looking South
  Steam Turbine Hall-East Side - Looking Southeast
 STH and Central Electrical Building - Looking West
  Steam Turbine Hall - Looking East
 Steam Turbine Hall-ST / GT Table - Looking Southwest


Steam Turbine Hall- ST/Gen. Table Formworks - Looking West
 Steam Turbine Hall- ST/Gen. Table Formworks - Looking Norhteast
  Central Electrical Building - Looking Southwest
  Central Electrical Building Ground Flr Staircase- Looking South
 MCW Pipes-Beneath New HV Line and FGD_GRP Phase 4 - Looking Southeast
 Reclamation of Existing 5 yr Ash pond - Looking Southeast
Cooling Water Pump House - Looking South

27.11.2012

  Boiler and Fabric Filter - Looking Southeast
  Boiler-Cavity Area - Looking South
  Boiler and Steam Turbine Hall-South Side - Looking Northwest
 Boiler- Installation of Pressure Parts Hanger 
  Absorber Area - Looking Southwest
  Booster Fans and FGD Duct Fdn - Looking Southwest
  ID Fans - Looking Northeast
 Screening House - Looking North
 er Electrical Building - Looking Northwest
 Fly Ash Silo-Spun Piling Works - Looking North
 Industrial Waste Water Treatment Plant-Spun Piling - Looking South
 Demin Water Treatement Plant - Looking Southeast
 Main Transformer Area - Looking Northwest
  Cooling Water Pipe -Phase 3 - Looking Northwest
 STH and Central Electrical Building - Looking West
Steam Turbine Hall-Structural Steel - Looking East
 OverHead Crane - Installation Preparation
 Steam Turbine Hall-ST / GT Table - Looking Southwest
 Central Electrical Building - Looking Southeast

26.11.2012

  Morning EHS Toolbox Meeting of Eversendai and Equator on Site
 Booster Fans and FGD Duct Fdn - Looking South
  Absorber Area - Looking Southeast
  Screening House - Looking North
  Fly Ash Silo-Spun Piling - Looking North
 Industrial Waste Water Treatment Plant-Spun Piling - Looking North
  Boiler Electrical Building - Looking Northwest
  Boiler and Fabric Filter - Looking Southeast
  Boiler-Cavity Area - Looking South
 Boiler and Steam Turbine Hall - Looking Northwest
  Boiler - Roof Girder Installation
 Demin Water Tank Fdn Works - Looking West
 STH and Central Electrical Building - Looking West
 Steam Turbine Hall - Looking East
  Main Transformer Area - Looking Northwest
  Cooling Water Pipe Around STH - Phase 3 - Looking Northwest
 CW Pipe Saddle -To Aeration Basin and CWPH- Looking South
Aeration Basin-Spun Piling Works - Looking South
 MCW-Bet. New HV Line and Aeration Basin - Looking Northeast
FDG DUCT Section Assembly Complete