16.08.2012

  Pan View_Phase2_SWFGD_GRP-North of Chimney - Looking East
 Pan View_Steam Turbine Hall-East Side - Looking West
 Pan View_Boiler-Pre Fab of Pressure Parts-Water Walls @ the Laydown Area
 Phase2_SWFGD_GRP-West of Chimney - Looking East
 Chimney - Looking Northwest
 Fabric Filter -West Side- Looking Southeast
 Fabric Filter -East Side- Looking Northwest
  Boiler Electrical Building - Looking Northeast
 Booster Fans - Looking Southeast
  Boiler-East Side - Looking Southwest
  Boiler Cavity Area - Looking South
   Boiler-West Side- Looking East
   Boiler-West Side- Looking Northeast
 Boiler-East Side - Looking Northwest
Boiler-Material Delivery-Header Pipe 
Boiler-Pre Fab of Pressure Parts-Water Walls @ the Laydown Area
 Boiler and Steam Turbine Hall-South Side - Looking North
 Boiler and Fabric Filter - Looking South
  Steam Turbine Hall-East Side - Looking South

 Condensate Make Up Tank - Looking Southeast
 Steam Turbine Hall - Prep. of the Fdn. Column @ corner West and North Side
 Demin  Water Treatement Plant -Spun Piling - Looking Southeast
   Phase 3_MCW Spun Piling- Looking Northwest
  Central Electrical Building - Looking Northeast
MCW-Bet. New HV Line and Aeration Basin - Looking Northwest


15.08.2012

  Pan View_Phase2_SWFGD_GRP-North of Chimney - Looking East
Pan View_Steam Turbine Hall-South Side - Looking North
 Pan View_Steam Turbine Hall-East Side - Looking West
 Phase2_SWFGD_GRP-West of Chimney - Looking East
 Chimney - Looking North
 Chimney - Power Supply for Slip Formworks
 Fabric Filter -West Side- Looking Southeast
Fabric Filter -East Side- Looking Northwest
  Boiler Electrical Building - Looking Southwest
  Boiler Electrical Building - Looking Northeast
  Boiler Electrical Building @ Elev.4.0M - Looking Northeast
 Booster Fans - Looking Southwest
  Boiler-East Side - Looking Southwest
 Boiler Cavity Area - Looking South
 Boiler-West Side-Stair Case - Looking Northeast
 Boiler-West Side - Looking Northeast
   Boiler-East Side - Looking Northwest
 Boiler and Fabric Filter - Looking South
 Steam Turbine Hall-East Side - Looking Northeast
  Steam Turbine Hall-North Side - Looking North 
   Steam Turbine Hall-East Side - Looking East
  Phase 3_MCW-Excavation Works- Looking Northwest
 Demin  Water Treatement Plant -Spun Piling - Looking Southeast
 Main Transformer Area-Spun Piling Works  - Looking East
  Central Electrical Building - Looking Northeast
  Central Electrical Building @ Elev. 4.0M - Looking Southeast
 MCW-Bet. New HV Line and Aeration Basin - Looking Northeast