27.10.2014

STH Level 16.0m overall view
STH Level 16.0m
STH Level 16.0m - replacement of bolts/threads for IP Actuator
STH Level 16.0m - replacement of bolts/threads for IP Actuator
STH Level 16.0m
STH Level 16.0m - removal of bearing casings
STH Level 16.0m - removal of bearing casings
STH Level 16.0m - removal of bearing casings
STH Level 16.0m - removal of bearing casings
STH Level 16.0m - removal of bearing casings
STH Level 16.0m - removal of bearing casings
STH Level 16.0m - slab rebar for finishing work
STH Level 16.0m - slab finishing work
STH Level 16.0m - cabling
STH Level 8.0m
Boiler Level 60.0m opening to spacer tubes
Boiler Level 60.0m old spacer tubes cut-out
Boiler Level 60.0m old spacer tubes cut-out
Boiler Level 60.0m old spacer tube being removed
Boiler Level 60.0m new spacer tubes to be installed
Aeration basin
Earth leveling at Aeration basin
MCWPH intake - water being pumped out
MCWPH intake - water being pumped out
MCWPH interconnecting pipe
Internal view of MCWPH
MCWPH

20.10.2014

Boiler east view
Boiler cavity
N2/CO2 gas bottles
Boiler tripper floor
Boiler tripper floor
Boiler tripper floor
Boiler tripper floor
Boiler tripper floor
Boiler
Boiler
Boiler 59m level
Boiler fire fighting pipe 59.0m level
Boiler 81.0m level
Boiler 81.0m level scaffolds for spacer tube placement
Boiler 81.0m level scaffolds for spacer tube placement
Boiler 81.0m level scaffolds for spacer tube placement
Boiler 81.0m level scaffolds for spacer tube placement
Boiler 81.0m level scaffolds for spacer tube placement
Boiler access road preparation
Tanks view
Service and Fire water tanks
Demin plant
FGD south view
Fabric filter roof top view
Transfer towers
Coal conveyor BC-07
Bottom ash conveyor
Industrial waste water treatment plant