26.06.2013

 IP Turbine
 IP Turbine
 IP Turbine
IP Turbine 
IP Turbine 
 IP Turbine
 IP Turbine
 IP Turbine
LP 2 Turbine 
 STG Table
 K11 Tank
De-aerator Tank
  K11 Tank
 Boiler cavity looking south
 Boiler Cavity looking north H/L
 Boiler Cavity looking north L/L
 STH 0m lvel polishing plant
Baby Turbine 1 west 
Baby Turbine 2 east  
CEB roof 
Compressor Building

25.06.2013

 MNG-4 Site AM
Power Block looking east 
Power Block looking north-east  
Power Block looking south-east  
 Power Block & BOP looking south-wast
 Power Block looking west
Power Block l& BOP looking north-wast 
 BOP looking south 
BOP looking south  
Laydown area looking south
Boiler North End

Boiler Cavity

STH - Lifting of HP Turbine

STH - CCW pipe

Boiler Electrical Building

Boiler Electrical Building

 Transformer Compound

Fabric Filter

FGD Duct Bypass

FGD Northwest End

ID Fan

 K11 Tank

MCW east of Turbine hall

24.06.2013

 MNG-4 Site PM
11kV back-feed supply 
 STH-Condenser
 STH-Condenser
STH-0m lvl ACW pipe
 MCWPH
 MCWPH
GRP Phase 4 
 GRP Phase 6
 GRP phase 3
 GRP phase 3
GRP Phase 3 
MCW east of Turbine hall
MCW & GRP bund crossing before aeration basin 
 MCW supply from  MCWPH
 MCW discharge drainage looking north
MCW discharge drainage looking south 
Piprack 10 
 Aeration basin north end
Aeration basin south end