 Project Management Site Walkdown at the Cooling Water Intake - Looking Northwest
 Chimney - Looking East
   Aerial View_SWFGD_GRP P2 West of Chimney - Looking North
 Phase2_SWFGD_GRP-West of Chimney - Looking East
  Aerial View_Fabric Filter - Looking North
   Aerial View_Boiler Electrical Building - Looking Northeast
 Boiler and Fabric Filter - Looking South
  Boiler-Cavity Area - Looking South
  Boiler-East Side - Looking Northwest
 Mill Side_16M Level Metal Decking for Concrete Slab and  Cold Air Manifold- Looking South
 Boiler-West Side-Ducting Installation - Looking Southwest
  Aerial View_BOP Area-Spun Piling-East Side of Boiler - Looking East
  Aerial View_Main Transformer Area - Looking South
  Condensate Make Up Tank - Looking West
 Steam Turbine Hall-South Side-Cooling Water Pipe Saddle - Looking West
  Phase 3_ Cooling Water Pipe Saddle - Looking Southeast
   Steam Turbine Hall-North Side-Cooling Water Pipe Saddle - Looking West
    Steam Turbine Hall-Structural Steel North Side - Looking Northeast
    Steam Turbine Hall-Column upto Table - Looking West
  Central Electrical Building - Looking Southwest
 CW Pipe Saddle -Bet. New HV Line and Aeration Basin - Looking South
  CW Pipe and Saddle -Bet. New HV Line and Aeration Basin - Looking North
CW Pipe-East Side-Beneath New HV Line- Welding of Joint Commence- Looking West
  Phase 4 SWFGD_GRP-Base Preparation - Looking East
Screening House-Spun Piling Works - Looking Wes

11.09.2012

 Chimney - Looking East
 Phase2_SWFGD_GRP-West of Chimney - Looking East
 Phase2_SWFGD_GRP-West of Chimney - Looking North
 Fabric Filter -East Side- Looking Northwest
 Fabric Filter -Column Base Grouting - Looking North
  Boiler Electrical Building - Looking Northeast
  Boiler-Cavity Area - Looking South
 Mill Side_16M Level Metal Decking for Concrete Slab - Looking West
  Boiler-East Side-Duct Riser, Coal Pipes Installation - Looking West
  Boiler-East Side - Looking Northwest
Boiler-West Side - Looking Southeast
  BOP Area-Spun Piling-East Side of Boiler - Looking North
  Main Transformer Area - Looking Northwest
 Steam Turbine Hall-South Side-Cooling Water Pipe Saddle - Looking East
  Phase 3_ Cooling Water Pipe Saddle - Looking Southeast
 Condensate Make Up Tank Foundation - Looking East
    Steam Turbine Hall-Structural Steel North Side - Looking Northeast
  Central Electrical Building - Looking Northeast
Stacker Reclamer-East Side -South of  Boiler Laydown Area - Looking North

10.09.2012

Morning Safety Tool Box Meeting of Eversendai and Equator on Site
 Morning Safety Tool Box Meeting of Equator on Site
Morning Safety Tool Box Meeting of Eversendai  on Site

 Chimney - Looking West
 Chimney Inside Windshell - Looking South
 Phase2_SWFGD_GRP-West of Chimney - Looking North
Phase2_SWFGD_GRP-West of Chimney - Looking Northeast
 Phase2_SWFGD_GRP-West of Chimney - Looking West
  ID Fans East Side- Excavation - Looking South
 Fabric Filter -East Side- Looking Northwest
 Boiler Electrical Building - Looking Northeast
  Boiler-Cavity Area - Looking South
 Boiler-West Side - Looking Southeast
  Boiler-East Side - Looking Northwest
 Mill Side_@ 16M Level Metal Decking for Concrete Slab - Looking West
  BOP Area-Spun Piling-East Side of Boiler - Looking Northeast
  Main Transformer Area-Excavation - Looking Northwest
 Steam Turbine Hall-South Side-Cooling Water Pipe Saddle - Looking East
  Phase 3_ Cooling Water Pipe Saddle Saddle - Looking Southeast
  Condensate Make Up Tank - Looking East
   Steam Turbine Hall-Structural Steel North Side - Looking Southeast
  Steam Turbine Hall-East Side - Looking North
  Steam Turbine Hall-Column upto Table - Looking Northwest
   Central Electrical Building @ Elev. 4.0M - Looking Northeast
 Central Electrical Building @ Elev. 4.0M - Looking North
 CW Pipe-Beneath New HV Line - Looking North
 CW Pipe Saddle -Bet. New HV Line and Aeration Basin - Looking South
  Phase 4 SWFGD_GRP-Base Preparation - Looking East
Screening House-Spun Piling Works - Looking North