28.12.2013

MNG4 south side view

MNG4 south side view

CEB and STH south side view


Client coal yard

Client HV Switchyard

Transfer Towers

Stacker reclaimer B foundation

Coal conveyor BC1

Coal conveyor BC1

Coal conveyor BC1

Aeration basin

Aeration basin

Aeration basin

CWPH

27.12.2013

Absorber/Reactor Tower

Fabric Filter south view

Coal Handling & BOP Elec Bldg

Boiler tripper floor

Boiler roof

STH roof and annex

MCW north end

MCW southeast of STH

Transfer Towers and Conveyor Belts

Stacker Reclaimer B

Bottom ash silo

Raw and Fire Water Tanks


Demin Plant and PR 'A'

Industrial Waste Basin

21.12.2013

MNG4 south side view


MNG4 south side view


CEB south side view


CEB and STH south side view


Client Coal yard


Client HV Switchyard


Transfer Towers

Stacker Reclaimer 2 foundation


Coal Conveyor BC1


Coal Conveyor BC1


Coal Conveyor BC1

Coal Conveyor BC1

Coal Conveyor BC1

Coal Conveyor BC1 main entrance view

Aeration basin

Aeration basin

Aeration basin

CWPH

20.12.2013

 Absorber north
Fabric Filter South
 FD Fan east
 PA Fan east
 Boiler Feeder Floor
PAB MCW outlet
 Demin Plant & PRA
 Raw & Fire water
 Industrial Waste Basin
 Coal Handling & BOP Elec BLD
 U/G Oil Separator
Crusher/Screening BLD