Boiler, FGD Ducts, Booster Fans and FF - Looking South |
Boiler - Looking Southwest |
Boiler - Looking Southeast |
Boiler-Pressure Parts Wall and Pipe Headers |
Boiler-Pressure Parts Wall |
Boiler-Coal Piping Installation |
Boiler - 100m Level East Side |
Boiler-Pressure Parts Pipe Headers (East Side) |
Boiler-Pressure Parts Pipe Headers (East Side) |
Boiler-Pressure Parts Pipe Headers (East Side) |
Boiler - Looking West |
Steam Turbine Hall - Looking West |
Steam Turbine Hall-ST / GT Table (North Side) |
Steam Turbine Hall-ST / GT Table (South Side) |
Steam Turbine Hall (South Side) |
MV Switchgear CEB - 4m level |
4 nos. of MV/LV Transformer CEB - 4m level |
Central Electrical Building cable tray installation- 4m Level |
Central Electrical Building - 10M level |
Central Electrical Building - 10m level |
Central Electrical Building - 16m Level |
Main Transformer Area- Looking East |
Main Transformer Area - Installation of 1st GSUT |
Main Transformer Area - Installation of 1st GSUT |
Fabric Filter - Looking North |
Fabric Filter - Looking Northeast |
Boiler Electrical Building - Looking North |
FGD Area - Looking South |
FGD Area - Looking North |
SWFGD GRP MCW Piping and Saddle Installation |
MCW Pipe Trench at Reclaimed Existing 5 yr Ash pond |
Service/Fire water storage tanks fdn works |
Demin Water Tank Fdn Works |
Demin Water Treatment Plant Fdn Works |
FGD Electrical Building & Pipe Rack 4 Fdns |
Fly Ash Silo Fdn |
Reclaimation Works |
Screening House - Looking Southwest |