Boiler, FGD Ducts, Booster Fans and FF - Looking South |
Boiler - Looking Southwest |
Boiler Duct Work - East Side |
Boiler - Looking Southeast |
Boiler-Pressure Parts Wall and Pipe Headers |
Boiler - Piping Installation Works |
Boiler - Scaffolding for LBC Cold reheat piping at 45M |
Boiler Area - Passenger Hoist Erection |
Steam Turbine Hall - Looking West |
Steam Turbine Hall - Looking West |
Steam Turbine Hall - Annex |
Steam Turbine Hall - Looking East |
Steam Turbine Hall-ST / GT Table - Looking North |
Central Electrical Building - 0M Level |
Central Electrical Building - 4M Level |
4 nos. of MV/LV Transformer lifted to CEB -4M level |
4 nos. of MV/LV Transformer lifted to CEB -4M level |
Central Electrical Building - 4M Level Cable Tray Installation |
Central Electrical Building - 16M Level |
Main Transformer Area- Looking East |
Boiler Electrical Building - Looking South |
Demin Water Tank Fdn Works |
Fabric Filter - Looking Northeast |
Cooling Water Pipe Saddle East Side of STH |
SWFGD GRP Phase 3 and MCW Saddle |
MCW Pipe Trench at Reclaimed Existing 5 yr Ash pond |
Reclaimed Existing 5 yr Ash pond |
Booster Fan, Absorbers and FGD Foundation - Looking South |
Service/Fire water storage tanks fdn works |
Demin Water Treatment Plant Fdn Works |
Fly Ash Silo Fdn |
MP / LP / HP Piping Prefabrication |
MP / LP / HP Piping Prefabrication |