Boiler, FGD Ducts, Booster Fans and FF - Looking South |
Boiler - Looking Southwest |
Boiler Duct Work - East Side |
Boiler - Looking Southeast |
Boiler - Cable Riser West Side |
Boiler - Cooling Water Pipe Trench between Boiler & STH |
Boiler-Pressure Parts Wall and Pipe Headers |
Boiler Area 2 Slab Concreting Works |
Boiler Area - Passenger Hoist Erection |
Steam Turbine Hall - Looking West |
Steam Turbine Hall - Looking North |
Steam Turbine Hall - Looking East |
Central Electrical Building - West Side |
4 nos. of MV/LV Transformer CEB -4M level |
Central Electrical Building - 4M Level Cable Tray Installation |
Central Electrical Building Floor Screeding - 10M |
Central Electrical Building - 10M |
Central Electrical Building - 16M Level |
Main Transformer Area- Looking East |
Boiler Electrical Building - Looking South |
Fabric Filter - Looking Northeast |
Cooling Water Pipe Saddle East Side of STH |
SWFGD GRP Phase 3 and MCW Saddle |
SWFGD GRP and MCW North of New HV Line |
Reclaimed Existing 5 yr Ash pond |
Demin Water Tank Fdn Works |
Demin Water Treatment Plant Fdn Works |
Service/Fire water storage tanks fdn works |
Fly Ash Silo Fdn |
FGD Area - Looking South |
Screening House - Looking Southwest |
Boiler LBC Piping Installation Preparation |