16.02.2013 - (Fixed)


Boiler, FGD Ducts, Booster Fans  and FF - Looking Southeast

Boiler - Looking Southwest

Boiler - Looking Southeast

Boiler-Pressure Parts Lifting Works

Boiler-Pressure Parts Wall and Pipe Headers

Boiler - Piping Installation Works

Boiler-Pressure Parts Wall and Pipe Headers

Boiler Area 2 Slab Concreting Works

Steam Turbine Hall - Looking West

Steam Turbine Hall - Looking East

Steam Turbine Hall-ST / GT Table - Looking East (south side)

Steam Turbine Hall-ST / GT Table - Looking East (north side)

Steam Turbine Hall-ST / GT Table - Looking South

Boiler Electrical Building - Looking South
Fabric Filter - Looking Northeast

Fabric Filter - Looking East

Central Electrical Building - 4M Level

Central Electrical Building - 4M Level Cable Tray Installation

SWFGD GRP Phase 3 and MCW Saddle
SWFGD GRP and MCW North of New HV Line

Reclaimed Existing 5 yr Ash pond

Service/Fire water storage tanks fdn works

Demin Water Tank Fdn Works

Demin Water Treatment Plant  Fdn Works

Fly Ash Silo Fdn

FGD Area - Looking South

FGD Area - Looking North