Boiler, FGD Ducts, Booster Fans and FF - Looking Southeast |
Boiler - Looking Southwest |
Boiler - Looking Southeast |
Boiler-Pressure Parts Lifting Works |
Boiler-Pressure Parts Wall and Pipe Headers |
Boiler - Piping Installation Works |
Boiler-Pressure Parts Wall and Pipe Headers |
Boiler Area 2 Slab Concreting Works |
Steam Turbine Hall - Looking West |
Steam Turbine Hall - Looking East |
Steam Turbine Hall-ST / GT Table - Looking East (south side) |
Steam Turbine Hall-ST / GT Table - Looking East (north side) |
Steam Turbine Hall-ST / GT Table - Looking South |
Boiler Electrical Building - Looking South |
Fabric Filter - Looking Northeast |
Fabric Filter - Looking East |
Central Electrical Building - 4M Level |
Central Electrical Building - 4M Level Cable Tray Installation |
SWFGD GRP Phase 3 and MCW Saddle |
SWFGD GRP and MCW North of New HV Line |
Reclaimed Existing 5 yr Ash pond |
Service/Fire water storage tanks fdn works |
Demin Water Tank Fdn Works |
Demin Water Treatment Plant Fdn Works |
Fly Ash Silo Fdn |
FGD Area - Looking South |
FGD Area - Looking North |