20.02.2013

Boiler, FGD Ducts, Booster Fans  and FF - Looking South
Boiler - Looking Southwest
Boiler-Pressure Parts Wall and Pipe Headers
Boiler-Pressure Parts Wall and Pipe Headers

Boiler-Pressure Parts Wall
Boiler Area 2 Slab Concreting
Boiler - 100m Level
Boiler - Piping installation
Boiler - Cable Riser West Side

Boiler LBC Piping Installation Preparation
Steam Turbine Hall - Looking West
Steam Turbine Hall-ST / GT Table - Looking East
Steam Turbine Hall-ST / GT Table - Looking East
Steam Turbine Hall-ST / GT Table - Looking West
Central Electrical Building - West Side
Central Electrical Building - 4m Level

4 nos. of MV/LV Transformer CEB -4M level
Central Electrical Building cable tray installation- 4m Level
Central Electrical Building - 10M level

Main Transformer Area- Looking East

Fabric Filter - Looking North
Fabric Filter - Looking Northeast

Cooling Water Pipe Saddle East Side of STH
SWFGD GRP Phase 3 and MCW Saddle

Existing 5 yr Ash pond
Service/Fire water storage tanks fdn works

Demin Water Tank Fdn Works
Demin Water Treatment Plant  Fdn Works
Fly Ash Silo Fdn

Booster Fan, Absorbers and FGD Foundation - Looking South
Booster Fan, Absorbers and FGD Foundation - Looking North

FGD Electrical Building & Pipe Rack 4 Fdns
Screening House - Looking Southwest

Arrival of 2 nos. GSUT at Site
2 nos. GSUT

Land Reclaimation Works