Boiler, FGD Ducts, Booster Fans and FF - Looking South |
Boiler - Looking Southwest |
Boiler-Pressure Parts Wall and Pipe Headers |
Boiler-Pressure Parts Wall and Pipe Headers |
Boiler-Pressure Parts Wall |
Boiler Area 2 Slab Concreting |
Boiler - 100m Level |
Boiler - Piping installation |
Boiler - Cable Riser West Side |
Boiler LBC Piping Installation Preparation |
Steam Turbine Hall - Looking West |
Steam Turbine Hall-ST / GT Table - Looking East |
Steam Turbine Hall-ST / GT Table - Looking East |
Steam Turbine Hall-ST / GT Table - Looking West |
Central Electrical Building - West Side |
Central Electrical Building - 4m Level |
4 nos. of MV/LV Transformer CEB -4M level |
Central Electrical Building cable tray installation- 4m Level |
Central Electrical Building - 10M level |
Main Transformer Area- Looking East |
Fabric Filter - Looking North |
Fabric Filter - Looking Northeast |
Cooling Water Pipe Saddle East Side of STH |
SWFGD GRP Phase 3 and MCW Saddle |
Existing 5 yr Ash pond |
Service/Fire water storage tanks fdn works |
Demin Water Tank Fdn Works |
Demin Water Treatment Plant Fdn Works |
Fly Ash Silo Fdn |
Booster Fan, Absorbers and FGD Foundation - Looking South |
Booster Fan, Absorbers and FGD Foundation - Looking North |
FGD Electrical Building & Pipe Rack 4 Fdns |
Screening House - Looking Southwest |
Arrival of 2 nos. GSUT at Site |
2 nos. GSUT |
Land Reclaimation Works |