Boiler, FGD Ducts, Booster Fans and FF - Looking South |
Boiler - Looking Southwest |
Boiler-Pressure Parts Wall and Pipe Headers |
Boiler - East Side |
Boiler Area 2 Slab Concreting Works |
Boiler - West Side |
Steam Turbine Hall - Looking North |
Steam Turbine Hall - Looking West |
Steam Turbine Hall - Annex |
Steam Turbine Hall-ST / GT Table - Looking South |
Central Electrical Building - South Side |
Central Electrical Building - 4m Level Central Electrical Building_MV Switchgear @ 4M Lvl |
Central Electrical Building cable tray installation- 4m Level |
Central Electrical Building - 16M Level |
Central Electrical Building - 10M Level |
Main Transformer Area- Looking East |
Main Transformer Area - Main Transformer Rails |
Boiler Electrical Building - Looking South |
Fabric Filter - Looking Northeast |
Cooling Water Pipe Saddle East Side of STH |
SWFGD GRP Phase 3 and MCW Saddle |
MCW Pipe Trench at Reclaimed Existing 5 yr Ash pond |
Reclaimation Works |
Demin Water Tank Fdn Works |
Service/Fire water storage tanks fdn works |
FGD Electrical Building & Pipe Rack 4 Fdns |