15.02.2013

 Boiler, FGD Ducts, Booster Fans  and FF - Looking Southeast
Boiler - Looking Southwest
Boiler Duct Work - East Side
Boiler-Pressure Parts Wall and Pipe Headers
Boiler Duct Work - East Side
Boiler-Pressure Parts Lifting Cables
Boiler_Area 2 Slab Concreting Works
Steam Turbine Hall - Looking South
Steam Turbine Hall - Looking West
  Steam Turbine Hall - Looking East
Main Transformer Fire Walls
Central Electrical Building - Looking Northwest
Central Electrical Building - 4M Level 
Central Electrical Building - 4M Level Cable Tray Installation 
Central Electrical Building - 10M Level Brickworks Installation
Main Transformer Area- Looking East
Fabric Filter Plant
 Boiler Electrical Building - Looking South
SWFGD GRP Phase 3 and MCW Saddle - Looking Northwest
MCW Pipe Trench at Reclaimed Existing 5 yr Ash pond
Reclaimed Existing 5 yr Ash pond
Service/Fire water storage tanks fdn works
Fly Ash Silo - Looking East