Boiler, FGD Ducts, Booster Fans and FF - Looking Southeast |
Boiler - Looking Southwest |
Boiler Duct Work - East Side |
Boiler-Pressure Parts Wall and Pipe Headers |
Boiler Duct Work - East Side |
Boiler-Pressure Parts Lifting Cables |
Boiler_Area 2 Slab Concreting Works |
Steam Turbine Hall - Looking South |
Steam Turbine Hall - Looking West |
Steam Turbine Hall - Looking East |
Main Transformer Fire Walls |
Central Electrical Building - Looking Northwest |
Central Electrical Building - 4M Level |
Central Electrical Building - 4M Level Cable Tray Installation |
Central Electrical Building - 10M Level Brickworks Installation |
Main Transformer Area- Looking East |
Fabric Filter Plant |
Boiler Electrical Building - Looking South |
SWFGD GRP Phase 3 and MCW Saddle - Looking Northwest |
MCW Pipe Trench at Reclaimed Existing 5 yr Ash pond |
Reclaimed Existing 5 yr Ash pond |
Service/Fire water storage tanks fdn works |
Fly Ash Silo - Looking East |