09.03.2013

 Power Block - Looking Southwest
 Boiler - Pressure Parts Walls
 Boiler - Air Preheater Steel Installation
 Boiler - Coal Piping
 Boiler_Cold reheat piping - west side at 45M lvl.
 Boiler_Cold reheat piping scaffolding  
  Boiler_Cold reheat piping - east side at 45M lvl.
  Boiler_horizontal cable tray installation 8M lvl
 Boiler_horizontal cable tray installation 6M lvl east side
 STH - ongoing concrete pouring on ST/Gen Table - looking east
  STH - ongoing concrete pouring on ST/Gen Table - looking south
   STH - ongoing concrete pouring on ST/Gen Table - looking east
 STH - Roofing installation
 CEB - roof slab - looking south
 CEB - cable pulling @ 0M lvl
 CEB - MV switchgear @ 4M lvl
 CEB - blockwork @ 16M lvl
 Main Transformer - Looking east
 BEB - Looking north
 FF and ID Fan Duct - Looking north

 Booster Fan - looking south
 Service/Fire/Potable tank foundation - looking east
 FGD_GRP and MCW pipe looking southeast
 Aeration basin and Coooling water discharge trench
Reclamation @ 25 year ash pond - looking east