Power Block - Looking Southwest
Boiler - Pressure Parts Walls
Boiler - Air Preheater Steel Installation
Boiler - Coal Piping
Boiler_Cold reheat piping - west side at 45M lvl.
Boiler_Cold reheat piping scaffolding
Boiler_Cold reheat piping - east side at 45M lvl.
Boiler_horizontal cable tray installation 8M lvl
Boiler_horizontal cable tray installation 6M lvl east side
STH - ongoing concrete pouring on ST/Gen Table - looking east
STH - ongoing concrete pouring on ST/Gen Table - looking south
STH - ongoing concrete pouring on ST/Gen Table - looking east
STH - Roofing installation
CEB - roof slab - looking south
CEB - cable pulling @ 0M lvl
CEB - MV switchgear @ 4M lvl
CEB - blockwork @ 16M lvl
Main Transformer - Looking east
BEB - Looking north
FF and ID Fan Duct - Looking north
Booster Fan - looking south
Service/Fire/Potable tank foundation - looking east
FGD_GRP and MCW pipe looking southeast
Aeration basin and Coooling water discharge trench
Reclamation @ 25 year ash pond - looking east