05.03.2013

Boiler, FGD Ducts, Booster Fans  and FF - Looking Southeast

Boiler - Looking Southwest

Boiler - Looking Northeast

Boiler - Looking West
Boiler-Pressure Parts Wall and Pipe Headers
 
Boiler - Area 2

Steam Turbine Hall (East Side)

Steam Turbine Hall Crane Load Test

Steam Turbine Looking Northwest
 
Steam Turbine Hall-ST / GT Table

CEB - Looking Souteast

CEB - Cable Pulling Started - 0m level

MV Switchgear CEB - 4m level

MV Switchgear CEB - 4m level
  
Blockwork CEB - 16m level

Main Transformer Area - GSUT#1 to #4

Main Transformer Area - GSUT#1 to #4

SWFGD GRP Phase 3 and MCW Saddle

SWFGD GRP and MCW North of New HV Line (North end)
 
MCW Pipe Trench at Reclaimed Existing 5 yr Ash pond
 
Service/Fire water storage tanks fdn works

FGD Area - Looking South