Boiler, FGD Ducts, Booster Fans and FF - Looking Southeast |
Boiler - Looking Southwest |
Boiler - Looking Northeast |
Boiler - Looking West |
Boiler-Pressure Parts Wall and Pipe Headers |
Boiler - Area 2 |
Steam Turbine Hall (East Side) |
Steam Turbine Hall Crane Load Test |
Steam Turbine Looking Northwest |
Steam Turbine Hall-ST / GT Table |
CEB - Looking Souteast |
CEB - Cable Pulling Started - 0m level |
MV Switchgear CEB - 4m level |
MV Switchgear CEB - 4m level |
Blockwork CEB - 16m level |
Main Transformer Area - GSUT#1 to #4 |
Main Transformer Area - GSUT#1 to #4 |
SWFGD GRP Phase 3 and MCW Saddle |
SWFGD GRP and MCW North of New HV Line (North end) |
MCW Pipe Trench at Reclaimed Existing 5 yr Ash pond |
Service/Fire water storage tanks fdn works |
FGD Area - Looking South |