Boiler, FGD Ducts, Booster Fans and FF - Looking Southeast |
Boiler - Looking Southwest |
Boiler-Pressure Parts Wall and Pipe Headers |
Boiler Area 2 |
Steam Turbine Hall (South Side) |
Steam Turbine Hall (West Side) |
CEB - Cable Trays Earthing - 0m level |
MV Switchgear CEB - 4m level |
MV Switchgear CEB - 4m level |
CEB - Electrical Cables 0m level |
Main Transformer Area - GSUT#1 to #4 |
Main Transformer Area - GSUT#1 to #4 |
Boiler Electrical Building |
Fabric Filter South Side |
SWFGD GRP Phase 3 and MCW Saddle |
MCW Pipe Trench at Reclaimed Existing 5 yr Ash pond |
FGD Area - Looking South |
FGD Pipe Rack 4 Fdn |