Boiler, FGD Ducts, Booster Fans  and FF - Looking Southeast
Boiler - Looking Southwest
 
Boiler-Pressure Parts Wall and Pipe Headers

Boiler Area 2

Steam Turbine Hall (South Side)

Steam Turbine Hall (West Side)

CEB - Cable Trays Earthing - 0m level

MV Switchgear CEB - 4m level

MV Switchgear CEB - 4m level

CEB - Electrical Cables 0m level

Main Transformer Area - GSUT#1 to #4

Main Transformer Area - GSUT#1 to #4

Boiler Electrical Building

Fabric Filter South Side

SWFGD GRP Phase 3 and MCW Saddle

MCW Pipe Trench at Reclaimed Existing 5 yr Ash pond

FGD Area - Looking South
FGD Pipe Rack 4 Fdn