Boiler - Lookin Southeast

Boiler-Pressure Parts Wall and Pipe Headers

Boiler - Looking at 0m lvl

Boiler-Pressure Parts Walls

Boiler-Pressure Parts Wall and Pipe Headers

Boiler - 100m Lvl

Boiler-Pressure Parts Wall and Pipe Headers (East Side)

Boiler - Area 2
Steam Turbine Hall (East Side) - Concreting of ST / GT Table in Progress


Steam Turbine Hall (West Side) - Concreting of ST / GT Table in Progress
Steam Turbine Hall  - ST / GT Table Concreting 1st Lift



Steam Turbine Hall - ST / GT Table at Sunrise

Steam Turbine Hall - ST / GT Table Panographic view

CEB - Cable Pulling Started - 0m level

MV Switchgear CEB - 4m level

Main Transformer Area - Arrival of Unit Transformer
 
Main Transformer Area - Arrival of Unit Transformer

Boiler Electrical Building

Fabric Filter South Side

Cooling Water/ Seawater Pipelines at overhead line area

Aeration basin area

FGD Pipe Rack 4 and FGD Electrical Building Fdns

Service/Fire water storage tanks fdn works

FGD Area - Looking South

Land reclaimation works