Boiler - Lookin Southeast |
Boiler-Pressure Parts Wall and Pipe Headers |
Boiler - Looking at 0m lvl |
Boiler-Pressure Parts Walls |
Boiler-Pressure Parts Wall and Pipe Headers |
Boiler - 100m Lvl |
Boiler-Pressure Parts Wall and Pipe Headers (East Side) |
Boiler - Area 2 |
Steam Turbine Hall (East Side) - Concreting of ST / GT Table in Progress |
Steam Turbine Hall (West Side) - Concreting of ST / GT Table in Progress |
Steam Turbine Hall - ST / GT Table Concreting 1st Lift |
Steam Turbine Hall - ST / GT Table at Sunrise |
Steam Turbine Hall - ST / GT Table Panographic view |
CEB - Cable Pulling Started - 0m level |
MV Switchgear CEB - 4m level |
Main Transformer Area - Arrival of Unit Transformer |
Main Transformer Area - Arrival of Unit Transformer |
Boiler Electrical Building |
Fabric Filter South Side |
Cooling Water/ Seawater Pipelines at overhead line area |
Aeration basin area |
FGD Pipe Rack 4 and FGD Electrical Building Fdns |
Service/Fire water storage tanks fdn works |
FGD Area - Looking South |
Land reclaimation works |