06.03.2013

Boiler, FGD Ducts, Booster Fans  and FF - Looking Southeast

Boiler - Looking Southwest

Boiler - Looking South 0m lvl

Boiler-Pressure Parts Wall and Pipe Headers

Boiler - Looking East

Steam Turbine Hall-ST / GT Table

Steam Turbine Hall - Main crane 110% load test

Steam Turbine Hall - Main crane 110% load test

CEB - Cable Pulling Started - 0m level

MV Switchgear CEB - 4m level
 
Cable tray works CEB - 10m level

Main Transformer Area - Electrical duct works

Fabric Filter South Side
 
Boiler Electrical Building

FGD Area - Looking South

FGD Area - Booster Fan