Boiler, FGD Ducts, Booster Fans and FF - Looking Southeast |
Boiler - Looking Southwest |
Boiler - Looking South 0m lvl |
Boiler-Pressure Parts Wall and Pipe Headers |
Boiler - Looking East |
Steam Turbine Hall-ST / GT Table |
Steam Turbine Hall - Main crane 110% load test |
Steam Turbine Hall - Main crane 110% load test |
CEB - Cable Pulling Started - 0m level |
MV Switchgear CEB - 4m level |
Cable tray works CEB - 10m level |
Main Transformer Area - Electrical duct works |
Fabric Filter South Side |
Boiler Electrical Building |
FGD Area - Looking South |
FGD Area - Booster Fan |