Boiler, FGD Ducts, Booster Fans and FF - Looking Southeast |
Boiler - Looking Southwest |
Boiler - Looking Southeast |
Boiler-Pressure Parts Wall |
Boiler-Pressure Parts Wall and Pipe Headers |
Boiler - Coal Piping Installation |
Boiler - Installation of Vertical Cable Riser (West Side) |
Boiler-Pressure Parts Wall and Pipe Headers (West Side) |
Boiler-Pressure Parts Wall and Pipe Headers (East Side) |
Boiler - LBC Piping Installation (East Side) |
Boiler - LBC Piping Installation (West Side) |
Boiler - 100m Level |
Steam Turbine Hall-ST / GT Table (North Side) |
Steam Turbine Hall-ST / GT Table (North Side) |
Steam Turbine Hall (West Side) |
4 nos. of MV/LV Transformer CEB - 4m level |
Delivery of Switchgear to CEB |
Delivery of Switchgear to CEB |
Main Transformer Area- Looking East |
Main Transformer Area - 1st & 2nd GSUT |
Boiler Electrical Building - Looking South East |
Fabric Filter - Looking Northwest |
Fabric Filter - Looking Northwest |
SWFGD GRP MCW Piping and Saddle Installation |
Cooling Water Pump House |
Demin Water Treatment Plant Fdn Works |
Fly Ash Silo Fdn |
FGD Area - Looking South |
FGD Area - Looking North |
FGD Pipe Rack 4 Fdn |
FGD Pipe Rack 4 & Electrical Building Fdns |
Electrical Ducting between Pit 4 and 5 |