27.02.2013

Boiler, FGD Ducts, Booster Fans  and FF - Looking Southeast

Boiler - Looking Southwest

Boiler - Looking Southeast

Boiler-Pressure Parts Wall

Boiler-Pressure Parts Wall and Pipe Headers

Boiler - Coal Piping Installation

Boiler - Installation of Vertical Cable Riser (West Side)

Boiler-Pressure Parts Wall and Pipe Headers (West Side)

Boiler-Pressure Parts Wall and Pipe Headers (East Side)

Boiler - LBC Piping Installation (East Side)

Boiler - LBC Piping Installation (West Side)

Boiler - 100m Level

Steam Turbine Hall-ST / GT Table (North Side)

Steam Turbine Hall-ST / GT Table (North Side)

Steam Turbine Hall (West Side)

4 nos. of MV/LV Transformer CEB - 4m level

Delivery of Switchgear to CEB

Delivery of Switchgear to CEB
Main Transformer Area- Looking East


Main Transformer Area - 1st & 2nd GSUT


Boiler Electrical Building - Looking South East

Fabric Filter - Looking Northwest

Fabric Filter - Looking Northwest

SWFGD GRP MCW Piping and Saddle Installation

Cooling Water Pump House


Demin Water Treatment Plant  Fdn Works

Fly Ash Silo Fdn

FGD Area - Looking South


FGD Area - Looking North
 
FGD Pipe Rack 4 Fdn
FGD Pipe Rack 4 & Electrical Building Fdns

Electrical Ducting between Pit 4 and 5