Boiler, FGD Ducts, Booster Fans and FF - Looking Southeast |
Boiler - Looking Northeast |
Steam Turbine Hall - Southeast side |
Boiler - LBC spools +45m west side |
Boiler - LBC spools +45m east side |
Boiler - LBC spools +45m south side |
Boiler - LBC spools +16m south side |
Boiler - LBC spools +16m south side |
Boiler - LBC spools +45m west side |
Boiler-Pressure Parts Wall and Pipe Headers |
Boiler Area 2 |
Steam Turbine Hall (East Side) |
Main Transformer Area - 1st & 2nd GSUT |
CEB - Cable Trays Earthing - 0m level |
MV Switchgear CEB - 4m level |
4 nos. of MV/LV Transformer CEB - 4m level |
CEB - 10m level |
Main Transformer Area- Looking East |
Boiler Electrical Building |
SWFGD GRP and MCW North of New HV Line (North end) |
SWFGD GRP Phase 3 and MCW Saddle |
MCW Pipe Trench at Reclaimed Existing 5 yr Ash pond |
Condensate Make-up Tank |
FGD Area - Looking South |
FGD Pipe Rack 4 Fdn |
Service/Fire water storage tanks fdn works |
Fabric Filter West Side |
Delivery of GSUT #3 and #4 |