01.03.2013

Boiler, FGD Ducts, Booster Fans  and FF - Looking Southeast

Boiler - Looking Northeast

Steam Turbine Hall - Southeast side
Boiler - LBC spools +45m west side

Boiler - LBC spools +45m east side

Boiler - LBC spools +45m south side

Boiler - LBC spools +16m south side

Boiler - LBC spools +16m south side

Boiler - LBC spools +45m west side


Boiler-Pressure Parts Wall and Pipe Headers

Boiler Area 2

Steam Turbine Hall (East Side)

Main Transformer Area - 1st & 2nd GSUT

CEB - Cable Trays Earthing - 0m level

MV Switchgear CEB - 4m level

4 nos. of MV/LV Transformer CEB - 4m level

CEB - 10m level

Main Transformer Area- Looking East

Boiler Electrical Building
 
SWFGD GRP and MCW North of New HV Line (North end)

SWFGD GRP Phase 3 and MCW Saddle

MCW Pipe Trench at Reclaimed Existing 5 yr Ash pond

Condensate Make-up Tank

FGD Area - Looking South

FGD Pipe Rack 4 Fdn

Service/Fire water storage tanks fdn works

Fabric Filter West Side

Delivery of GSUT #3 and #4