FGD, Fabric Filter and Power Block |
Boiler - East Side |
Boiler - Pressure Parts and Walls |
Boiler Backpass Hanger Rods Support Structure |
Steam Turbine Hall (East Side) |
MCW Pipeline from South of Turbine Hall |
CEB - Cable Pulling Works in progress - 0m level |
CEB - Switchgear Installation at 4m level |
CEB - West side |
Fabric Filter Plant East Side |
MCW and MCW Saddle south of HV Line |
MCW and GRP Pielines South of HV Line |
Aeration basin |
Aeration basin |
CW Discharge Trench |
FGD - Duct Erection |
Screening Plant Foundation |
Service/Fire/Potable tank foundation - looking east |