18.03.2013

FGD, Fabric Filter and Power Block

Boiler - East Side

Boiler - Pressure Parts and Walls

Boiler Backpass Hanger Rods Support Structure

Steam Turbine Hall (East Side)

MCW Pipeline from South of Turbine Hall

CEB - Cable Pulling Works in progress - 0m level

CEB - Switchgear Installation at 4m level

CEB - West side

Fabric Filter Plant East Side

MCW and MCW Saddle south of HV Line

MCW and GRP Pielines South of HV Line

Aeration basin

Aeration basin

CW Discharge Trench

FGD - Duct Erection

Screening Plant Foundation

Service/Fire/Potable tank foundation - looking east