Power Block Southeast Side |
Boiler - Pressure Parts and Walls |
Boiler - Coal Piping Erection |
Boiler Backpass Hanger Rods Support Structure |
Boiler - Horizontal cable Tray Erection (West side) |
Boiler - LBC piping (West side) |
Boiler - Area 2 |
STH - ST/GT Table (North side) |
CEB - Cable Pulling Works in progress - 0m level |
CEB - 4m level |
CEB - 10m level |
Main Transformer Area - Looking east |
CEB - 25m level |
Fabric Filter Plant Casings East Side |
Fabric Filter Plant & BEB |
Fabric Filter Plant |
FGD_GRP and MCW pipe looking southeast |
Aeration basin and Coooling water discharge trench |
Service/Fire/Potable tank foundation - looking east |
Demin Water Plant Foundation |
FGD Area South side |
FGD Bypass Area |
FGD Electrical Building Foundation |
Fly-ash Silo Foundation |
Land Reclaimation |