16.03.2013

Power Block Southeast Side

Boiler - Pressure Parts and Walls

Boiler - Coal Piping Erection

Boiler Backpass Hanger Rods Support Structure

Boiler - Horizontal cable Tray Erection (West side)

Boiler - LBC piping (West side)

Boiler - Area 2
 
STH - ST/GT Table (North side)

CEB - Cable Pulling Works in progress - 0m level

CEB - 4m level
CEB - 10m level

 Main Transformer Area - Looking east
CEB - 25m level




Fabric Filter Plant Casings East Side

Fabric Filter Plant & BEB
 
Fabric Filter Plant

 FGD_GRP and MCW pipe looking southeast

 Aeration basin and Coooling water discharge trench


Service/Fire/Potable tank foundation - looking east

Demin Water Plant Foundation

FGD Area South side
FGD Bypass Area


FGD Electrical Building Foundation

Fly-ash Silo Foundation

Land Reclaimation