27.08.2013

 Generator HV test in proccess
 Duplex heater east side
Duplex heater west side
Duplex Heaters  
STH 16m lvl
 Generator
 IPB
 STH 8m lvl
 STH grd lvl east of condenser
 Excitation Rm
 Lub oil Rm
 STH Cladding
 STH south-side stairwell
 Pipe-rack 1
 FGD duct-work
 Fabric Filter
 Boiler northend
 Boiler Lower Furnance assembly
Compressor Bldg
 Electrical Ducts between Pit 7 & 8
 MCW north of STH
Fire Fighting U/G pipe south of CEB
 Fire-Fighting Bldg Steel Erection
 Demin. Plant
 Coal Yard and BOP Electrical Building
 Oily Waste Emg. Drain pit
 MCW pipe
Client HV yard and New HV tower