29.01.2013

 Power Block_Looking North
Boiler- Pressure Parts Headers and Walls
Boiler_North side - Looking North
  Boiler-Coal Pipes Installation and Scaffolding for Electrical Riser - Looking west
 Boiler-Ducting Installation - Looking West
Boiler_Area 1
 Boiler_1250T Crawler Crane Demob Preaparation
 Steam Turbine Hall -Looking Southwest
 Steam Turbine Hall Annex -Looking Northeast
  Cooling Water Pipe Saddle North Side of STH- Looking West
 Cooling Water Pipe South Side of STH- Looking East
 Electrical Pit # 002 & 003, Condensate Make up Tank
  Central Electrical Building - Looking North
  Central Electrical Building - Ground Floor 
   Central Electrical Building - Second Floor 
  Main Transformer Area - Looking Northeast
 Fabric Filter-East Side - Looking Southwest
 FGD Area - Looking Northwest
 FGD Duct to ID Fans - Looking Northwest
 FGD Area - Looking East
  Boiler Electrical Building - Looking Southwest
  Phase 4_SWFGD_GRP Pipe - Looking Northeast
 Aeration Basin-Spun Temporary Works - Looking East
 Cooling Water Pump House - Looking South
 Fly Ash Silo - Looking North
 Bottom Ash Silo - Looking South
Piperack #4 - Looking West
  Service Water/Fire Water Storage Tank - Looking North
  Demin Water Tank Fdn Works - Looking North
  Demin Water Tank Fdn Works - Looking North
Transfer Tower #10 - Looking North